Date: 7/2/2000

Prepped cut outs and jigged horizontal stabilizer for...

Prepped cut outs and jigged horizontal stabilizer for bonding into fuselage. Applied first two layers to inside of fuselage to horizontal.

Task Hours: 3

Date: 7/9/2000

Laminated remaining layers around inside of horizontal...

Laminated remaining layers around inside of horizontal and let cure.

Task Hours: 2

Date: 7/23/2000

Laminated two layers around both sides of horizontal...

Laminated two layers around both sides of horizontal where it exits fuselage.

Task Hours: 2

Date: 7/22/2002

Stabilizer Tips

Cut horizontal stabilizer tips for fabricating the counterweights.  Laminated the front portions to the stabilizer.

Task Hours: 1

Date: 8/5/2002

Elevator Tips

Bonded rear portion of elevator tips to elevators.  I used two layers on the outside for the initial layup and will add two layers to the inside after that cures.  The GI's had a problem with cracking at the inside corner.  This should prevent it.

Task Hours: 1

Date: 4/27/2003

Horizontal Close-outs

Sanded the final gap between the horizontal and elevator.  Laminated ends of horizontal to finish closing out this area.

Task Hours: 1

Date: 5/4/2003

Horizontal Stabilizer Close-Outs

Sanded laminates of elevator counterweight cutouts on horizontal stabilizer.

Task Hours: 2

Date: 5/18/2003

Horizontal Stabilizer Close-Outs

Finished capping and filling horizontal stabilizer ends at counterweight cutouts.